We classify every crack before injecting it — structural cracks get epoxy, active leaks get flexible polyurethane, and both get a written scope before we start.

Misclassifying a crack is the single most common mistake in this trade — treating a structural crack with the wrong material, or injecting a crack that actually needed a broader drainage fix behind it. We classify before we inject, every time.
Misclassifying a crack is the most common mistake in this trade, and it's the first thing we check on every Russellville, AL job.
Most crack injection appointments can be scheduled within a day or two of your call.
A single crack repair is one of the most predictably priced jobs we do — no surprise scope creep.
Polyurethane expands to fill voids behind an actively weeping wall; epoxy is reserved for cracks that need structural bonding.

We scope every Foundation Crack Repair job in person before quoting it, since two properties with the same symptom rarely need the same fix.
Structural cracks that aren't actively leaking get epoxy injection, which bonds the concrete back together rather than just sealing the surface.
Cracks that are still weeping get flexible polyurethane, which expands into voids and stays flexible enough to handle minor seasonal movement.
We also check for bowing alongside stair-step cracks, since that combination can point to a bigger structural issue.
We document crack width and location with photos before and after injection so you have a record of the repair.
Selling a Russellville, AL home with a flagged foundation crack? We can inspect, repair, and provide documentation for the buyer's lender or inspector.

Tell us the crack's location, whether it's actively leaking, and roughly how wide it is so we can bring the right materials.
We also check the exterior grading near the crack, since poor drainage is often what caused it in the first place.
You'll get a price based on crack length and material — epoxy or polyurethane — before any drilling starts.
Most single-crack injections are completed in a few hours, start to finish, in one visit.

"We were selling the house and the inspector flagged a foundation crack. They came out within two days, injected epoxy, and gave us documentation for the buyer's lender."
— Russellville Seller
"They explained why our crack was structural and not just cosmetic, which the previous contractor never bothered to check."
— Russellville Homeowner
"Appreciated the before-and-after photos for our records in case we ever need them for a future sale."
— Russellville Customer
"Fast, clean work — no mess left behind after the injection ports were patched."
— Russellville Homeowner
Active leaks get flexible polyurethane regardless of classification, since stopping water intrusion is the immediate priority.
Catching a crack early with injection usually costs less than waiting until it's actively leaking.
Epoxy is better for structural bonding on a non-leaking crack; polyurethane is better for a crack that's actively weeping since it cures even with water present.
Most single-crack injections are completed in a few hours during one visit.
If new movement occurs elsewhere in the wall, that's a separate issue we'd assess independently.
Turnaround is usually fast enough to fit within a typical closing timeline.
Selling a Russellville property on a tight timeline? Call +1-866-476-1348 and we'll prioritize scheduling around your closing date.



Zip codes we serve in Russellville, AL: 35654 35653
Call now for a free inspection and a flat-rate quote before anything gets worse.
Call +1-866-476-1348© SGP Waterproofing. All rights reserved.